IvanZ Construction

Busia District, Uganda

← Back to portfolioDrainage

Busia Town Stormwater Drainage

Busia MunicipalityCompleted 2024-05
Drainage pipes and stormwater infrastructure installation

Project scope

1.2 km open channel drainage network

Installation of an open channel drainage network with catch pits, culvert connections, and outfall structures to reduce flooding in a high-traffic commercial area during heavy rains.

  • 1.2 km drainage network
  • Catch pits and culvert connections
  • Flood reduction in commercial zone
Need a quote? Chat now →